Today’s post is just a small update to keep you guys in the loop of what’s going on. Since the last update not much has changed, the engine bay is a step closer to completion, some wiring still needs to be completed in the interior and the body panels have been removed and sent off to paint.

I’ve provided a few photos below of how the car sits at this point in time.

For those who need to catch up on the previous posts, the link is below…

Track Bred EG6 Build…

 

Moving on with the photos…

Almost there… Taking a closer look you will see that the Blueprint Racing block off plate has been swapped out for its K-Tuned counterpart…

 The gearbox has been changed from the previous setup to a Gear X close ratio gearbox with a 5.8 final drive complete with a ATS 1.5 way LSD and Tilton clutch kit.

The engine bay is almost complete with the majority of the lines and hoses already ran, compared to how it was in the previous update.

Interior coming together, if you guys pay close attention you would notice the shifter cables are finally installed and the reservoir bottles have been mounted and the lines ran. The next step from here is completing the remainder of the wiring work to be done.

Jerry removed all the body panels and sent them to be resprayed as some minor adjustments were made.

Man and machine…

Closing out today with this last shot of  the windshield installed and some of the sponsor stickers applied. Thanks for taking a look and stay tuned for the next update…

Advertisement

One thought on “Track Bred EG6 Build… Part 7

  1. Pingback: Track Bred EG6 Build… Part 9 | TDSAutoMag

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: