Special K… Part 2

IMG_1042

Picking up where we left off, Special K was fresh out the booth and the guys needed to reassemble the car for Chubz to collect. After leaving the paint shop Chubz made sure that Special K made a few appearances, first on display under the SDRR booth at JDM Squared Spring Break meet and then followed closely at a track day at the Bushy Park circuit. With the next BADD event a few months away, both Chubz and the sponsors thought it was a good move for him to make a few adjustments to the motor setup before the event. While the engine was, out the sponsors took the opportunity to make some slight additions throughout the car.

 

For those who would have missed the previous posts, you can click the link below…

Special K…

DSC_0080

DSC_0084

I made another trip to the paint shop to snap a few photos while the guys were putting the finishing touches on the car before handing it over to Chubz.

DSC_0091

DSC_0092

The previously damaged areas looking as though they never had an issue…

DSC_0087

DSC_0105

While Chubz waited for the guys to finish up, he applied the some stickers to the car…

DSC_0103

Quick shot of the bay with the soon to be NOS fed motor…

DSC_0094

The guys making the final adjustments…

DSC_0108

One final shot of the freshly painted front bumper…

IMG_9784

A look at the freshly applied sponsor sticker…

DSC_0148

Special K at the SDRR booth during JDM Squared Spring Break meet…

IMG_0928

Hanging with the big boys at one of Bushy Park’s track days…

IMG_6064

Shortly after the track day, the teardown began…

IMG_6069

IMG_6066

With the engine bay fully stripped the next step was to hand it over to the sponsors, SDRR. They would now be spearheading the shaving and tucking of the engine bay.

IMG_5229

As the car sat patiently outside of SDRR…

11391181_1651136381776257_5405315381587777876_n

The guys at SDRR started out by identifying what needed to be shaved and filled then they went to work on the lines. To ensure that the bay would be as clutter free as possible, they opted to tuck the fluid bottle for the clutch master cylinder and relocated it inside the wiper panel.

11401177_1651136385109590_3913596337349131393_n

A quick look at the lines from the master cylinder…

IMG_5088

IMG_6065

The headlight harness would now be rerouted on the underside of the fender in a flame retardant sheathing that would also keep the wires free from any moisture that may occur. Along with the harness, you can also see the brake and clutch lines have also been rerouted on the underside of the fender.

IMG_5087

In addition to the brake line tuck, the fuel lines would also be replaced and rerouted on the inside of the car…

11406857_1651147411775154_1366694951257609649_n

10494563_1651147425108486_1275688254812683817_n

The stock metal hard lines have been replaced with steel braided lines with AN fittings…

DSC_0684

The proportioning valve which once was within the engine bay has been removed and not only mounted on the inside of the car but it has also been replaced with a Wilwood counterpart…

11220128_1651147418441820_4393463784569912903_n

A look at the braided brake line from the proportining valve to the rear where it will split and run to the rear brakes…

 

Meanwhile, things were looking good with the engine rebuild…

IMG_6062

A look at the head shortly after it was removed and fully stripped…

IMG_5987

Another view of the head after it received some mild porting…

IMG_9381

The fully disassembled motor. Going back up Chubz will be swapping out the stock A3 pistons and raising the compression slightly with some Type R pistons. These will now bring the compression from 9.8:1 to 11:1. However, he will retain the use of the A3 rods, bolts and crank.

IMG_9380

The stock head bolts were replaced with ARP studs and the Type R cams remain…

IMG_6072

The car back at the body shop where the engine bay was being spot welded…

IMG_6071

A full view of the work done within the bay…

11412406_1651135701776325_2464221926944969326_n
11407142_1651135698442992_8381682747659100396_n

Closer look at the left and right side of the bay…

IMG_6073

All of the lines were removed after the mock up, and the engine bay was then prepared to be painted…

IMG_5690

Fresh…

IMG_5747
IMG_5788

A few shots of the naked bay before it’s reassembled…

11412251_1651182728438289_1661021790487914182_o
11411730_1651151835108045_5156499459661604960_o

Final shots of the well executed bay with the motor installed…

IMG_9774

IMG_7284

Shortly after the car was driving once again, it returned to SDRR to have the NOS setup installed…

IMG_7285

The guys just before they begun…

11116317_1653211994902029_7052229474936163512_o-2

The three bulkhead fittings installed, the steel braided line is for the NOS and the other two are the fuel return and the fuel supply…

IMG_0470

The lines from the bulkhead fittings were grouped together with the engine harness and fed to the NOS solenoid…

IMG_9878

With that completed, the mock up for the intake lines were in progress…

IMG_0474

The custom made lines that will feed the NOS to the intake manifold and a T that will allow for even distribution to all four ports…

IMG_0475

IMG_0473

A look at how it all comes together…

IMG_0476

IMG_0478

IMG_0479

A few shots of Michael from SDRR as he puts the finishing touches on the setup…

IMG_0472

A view from above showing how it comes together…

10151796_284631365040936_3413640448743150705_n

Taking a step back…

IMG_0469

How it looks head on from engine level…

10548048_1657451447811417_6279024521576041167_o

DSC_0606

Final shots of the setup…

 

After the guys finished with the engine bay it was time to get on with the remainder of the setup…

IMG_0666

NOS gauge to be installed…

IMG_0674

After the install…

1422622_285632078274198_6176331114441745278_n

The plumbing being done for the two bottles…

IMG_0675

A look at the finished product…

IMG_0667

Tanks installed and ready for action…

10942590_242593065911433_424856575002745155_n

IMG_0287

IMG_0286

A few random shots of Special K…

IMG_6002

With Drag Warz around the corner Chubz main sponsor made sure he wouldn’t be struggling for traction and supplied him with some M & H drag slicks…

 

There was only one more thing on the list to be completed…

IMG_0670

Sponsor sticker removed…

IMG_0669

IMG_0672

And the carbon fibre hood was treated to some much needed sanding…

IMG_0671

With the hood back in place, Chubz took the car to have the livery redone…

IMG_0865

A look at the new livery, which is quite an improvement from the previous one…

 

Chubz would like to thank all his sponsors Hunte’s Auto Spares and SDRR for all the work done to the car throughout this rebuild. Additional thanks go out to Bally and Karl for the work they put in on the car also to Wendall Holmes for aiding Chubz in sourcing parts which he wasn’t able to attain locally; Jerry from JVM Signage for providing all of the stickers who is also the person responsible for the new livery. And last but not least Chubz would like to give a big thanks to Michael Bailey’s Body Shop for all the great work they have done on Special K.

 

Thanks for taking a look and stay tuned for more to come on this build…

Advertisement

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: